Forest Garden Oakley 8x10ft Overlap Apex Summerhouse w/ Installation

Robert Dyas £2,189.99 Go to Robert Dyas First seen in Jul 2022
Description
A stylish and modern take on the traditional summerhouse design, the OPASUM810DDM is a cosy addition to have in any garden. Designed with large windows to let in as much light as possible, perfect for a hobby room or reading den. Made with overlap boards this modular summerhouse is a perfect improvement to any garden. The timber used throughout this summerhouse has been Pressure Treated, which gives it a 15-year guarantee against rot and fungal damage. These high-quality garden buildings are manufactured in the UK with FSC certified timber. All fixtures, fittings and felt needed to build these modular summerhouses are included, along with easy-to-follow instructions. Features and Benefits Stylish and contemporary addition to any garden The large windows allow plenty of natural light in Available with an additional veranda Space for a chairs and table set Manufactured using traditional overlap board construction to encourage rainwater run-off Pressure treated to ensure longevity 15-Year Anti-Rot Guarantee Manufactured from FSC certified timber Specifications Model Number: OPASUM810DDMHD Self Assembly Required: Yes Dimensions 300.6 × 260.7 × 225.6 cm Construction Type: Overlap Roof Type: Apex Treatment: Pressure Treated Colour: Natural Timber Guarantee: 15-year Anti-rot FSC Approval: Manufactured from FSC-certified timber Country of Origin: United Kingdom Product Size (h x w x d) cm Overall dimension when assembled, including overhangs: 225.6 x 260.7 x 300.6 Ridge Height (cm): 225.6 Eaves (cm): 152.6 Wall Cladding Thickness (mm): 7 Door Type (single / double): Double Door Size (cm): 164.5 x 57.5 Opening Door (cm): 115.6 x 165.2 Number of Windows: 6 Glazing: Yes Glazing Material: Acrylic External Window Opening Size (cm): Front - 47.2 x 106.8, Side - 50.15 x 106.8 Roof Material Inner: OSB (Oriented Strand Board) Roof Thickness (mm): 8 Roof Material Outer: Green Mineral Felt Floor Material: Boarded Door Locking: Barrel Bolt Delivery Information You will be contacted towards the end of your lead time by Forest Garden or their Courier with a delivery date. If this date is not convenient you can reply to the message to book a more convenient delivery date. The delivery timescales are as stated on the product page with the exception of the below Post Codes where the lead time may be extended: AB-CO-DD-DG-EH-FK-G-IP-IV-KA KW-KY-ML-NR-PA-PE-PH-PL-TD-TR. We are sorry but Forest Garden do not deliver or offer an assembly service to the following Postal Codes: BT1-BT99, GY1-GY9, HS1-HS9, IM1-IM9, IV41-IV56, JE1-JE5, KA27-KA28, KW15-KW17, PO30-PO41, PO49, TR21-TR25. Installation Process We also offer an installation service on selected products. So, if you'd rather take a back seat when it comes to building, don't worry. Our assembly service means your new purchase is in safe hands and you can leave all the hard work and heavy lifting to us. After you have booked in your delivery, you will be contacted separately to arrange a suitable installation date. This will usually be carried out by our own expert fitting team. However, depending on your location or purchase, we may use a third-party company. Some products, such as the Vale Greenhouses, Gazebos and Retreat Sheds, offer installation on the same day as delivery. For most products, however, delivery and installation will be arranged separately. Installation is typically within 7-10 days of delivery, however at certain times of the season and depending on postcode this can increase to 3-4 weeks, please check with your retailer when ordering.  Upon delivery of your product, it is important to check all parts and sections to ensure everything is present. If there are any shortages or damaged parts, please contact us and we will ensure the required parts are supplied before the installation team arrive. If a job is aborted because the item has not been checked there will be a further charge to rebook.  Ideally, store the product as close to the assembly location as possible with the sections laid flat and cover the roof and floor sheets where practical. We do offer the service of installing in your absence as long as you have side access. We do need written consent and clear instructions on the position of the shed.  On the day of Installation please ensure:  - There is a suitable solid level base prepared before the installers arrive on the day. If you require advice on building a base, please see our base preparation letter for guidance. Should the job be aborted due to an unsuitable base, there is likely to be a revisit charge.  - The area for the build is unobstructed. The installation team require at least 18 inches around the whole building. Therefore, please ensure there are no obstacles that may hinder the installation such as other garden buildings, fish ponds or structures. Please make sure all vegetation is cut back prior to the installers arriving to allow for a successful build. Also, please make sure the garden is free of any trip hazards such as children's toys, tools, etc. We also ask that any pet waste has been cleared from the garden.  - You have requested permission from your neighbours for our assembly team's access if required.  - There is suitable access to the installation site without having to enter your property. We are not insured to carry items through your property. If you do not have suitable access then you will have to arrange for the items to be moved to the site of installation prior to the fitters arriving. - There are adequate parking facilities for the assembly team's vehicle and any necessary parking permits have been secured.  - There is access to power at the site (our installation teams carry extension cables).  - There is someone at the property for the entire time of the installation. This is particularly important so the installers can check you are happy with the siting of the product prior to the commencement of installation, and for the installers to familiarise you with your new building after the build is complete.  For further details on how to correctly prep the installation area, see Forest's handy preparation guide HERE
You may also like
Discover more
We may earn a commission when you use our links to visit a store and make a purchase. We use cookies to enhance your experience with us. Read more. OK